Fortune 500 Bank

Large multinational bank needed to validate a chimney based cooling solution was working as designed

 

Read more...

Customer Challenge

  • Needed to evaluate the effectiveness of chimney-based cooling vs. hot aisle containment in their tier 3 facility
  • Validating CFD airflow patterns were predicted accurately
  • Concern around positive or negative pressure building up in chimney impacting exhaust airflow

The Approach

  • A LiveDC field kit of pressure, thermal sensors were temporarily installed in key locations and data collected under floor, in cabinet, in chimney, and above ceiling.
  • Custom cabinet/chimney elevation view maps were used to visualize thermal patterns over time

Solution & Results

  • Real time results stopped team members from debating if  chimney cabinets were preforming as designed.
  • Chimney-based cooling was confirmed to be working as design and proved to be more effective then rear exhaust.
  • Validation of collocation SLA’s were measured over a period of time

 

Electrical Utility Provider

Large electrical utility provider needed to measure energy optimization savings due to data center facility and operational modifications in order to obtain government “Green Data Center” tax credits

Read more...

Customer Challenge

  • Government “Green Data Center” tax credits were available, but the customer needed to prove that changes were implemented resulting in utility power reductions
  • It was difficult for the customer to measure and show this over time

Our Approach

  • LiveDC field kits were used to certify energy optimization as a part of the Xcel Energy Data Center Efficiency program.
  • Test were completed on current facilities and IT related equipment to set a base line. Post measurements were completed to prove energy savings.

Solution & Results

  • Historic data capturing proved energy and cost savings in the optimization of data center spaces and IT systems.
  • Customers received rebates for saving energy
  • Clear return on investment was documented and validated

high-tech2

Regional Healthcare Provider 

Improved communication, operational visibility, and capacity forecasting

 

Read more...

Customer Challenge

  • Business expectations around availability and agility were increasing
  • Visibility into data centers and critical environments was limited due to tooling
  • Communication challenges with facility management resulted in finger pointing
  • Capacity forecasting was difficult

The Approach

  • Implement LiveDC to replace operational monitoring tool to provide DCIM capabilities
  • Create custom forecasting metrics and dashboards
  • Build notification rules and process to support both facilities and IT needs

Solution & Results

  • Cohesion between IT and facility management teams
  • Improved operational monitoring/alerting of facility events
  • Real-time visibility of data center health
  • New capability created to forecast data center power/cooling/space capacities

National Civil Engineering Firm 

Analyzed potential user experience impact of relocating by simulating user access from multiple locations

Read more...

Customer Challenge

  • Facing a headquarter relocation resulting in losing current data center needed to review hosting options
  • Concerned about application performance degradation due to additional latency being introduced depending on hosting location
  • Lacking tools to objectively analyze the impact

The Approach

  • Leverage remote LiveDC collectors running in multiple locations to simulate end users accessing real applications
  • Create custom application performance monitoring scripts and execute over an extended period
  • Log results to LiveDC for reporting and analysis

Solution & Results

  • Concerns about latency being introduced were confirmed